We're out of school today, along with just about every other school, counseling program, martial arts school, civic organization and sports league in the area, so I'm trying to put this found time to good use. This morning I've been cutting and fitting plywood to enclose the last bit of open ceiling, insulating as I go. Now that it's almost done (and not a moment too soon--the attic was warm enough to break a sweat and the rooms below are cold and breezy) I'm almost ready to finish up the wiring in the new upstairs bathroom* and then get to work running supply plumbing. I hope to have the old floor out and the new stuff going in before Monday. It's a holiday for us, but I'm already signed up to take tickets at the wrestling tournament. Still, if I can get the floor out and prepped for the new floor, I'll be very close to finishing this thing. I have all the fixtures except the tub, and the drain stack is finished, complete with an attic vent. The wiring is so close I can see it in my head, and everything that's connected works perfectly. I just need to get the switches done, add the last light fixture over the mirror, and connect the junction downstairs.
( *The wiring would be done if I hadn't made a mistake with the switches in the bathroom last week--right before I went on duty and had to quit for the night.)
Next step: wire the hot tub.
ReplyDelete酒店小姐
ReplyDelete酒店兼職
禮服店
酒店經紀
酒店兼差
酒店打工
酒店上班
假日打工
台北酒店經紀
童裝批發
童裝批發
酒店喝酒
暑假打工
寒假打工
酒店
酒店經紀人
酒店現領